When the soccer club approached us to quote this project we knew that the transformation would be spectacular.
Even we were blown away with what we achieved.
The space was so run down, muddy and covered in rubbish.
The base on the 800m2 futsal pitch came up amazing. A solid base is always the key to a successful field.
We added new... |
Read More |
The existing surface of this government facility had servere water pooling issues. The pitch had not been built with sufficient fall or proper drainage.
Our process involved:
Excavate and remove existing surface
Raise surface height with additional rock
Laser grade appropriate fall
Add aggi pipes and spoon drain
... |
Read More |
Mackellar's oval was dry and barren during the summer months, muddy and unusable during the wet months.
The transformation of the oval took 4 months and the process included:
Excavation and removal of soil
Crushed rock base laser graded
Crushed stone dust base laser graded
Concrete edging and spoon drains
... |
Read More |
Continental Tyres had Endless turf provide them with synthetic soccer pitches at several Asian cup games around Australia during the 2015 Australian Asian Cup including the final in Sydney.
Other venues included Suncorp Stadium Brisbane and Federation Square in Melbourne's CBD.
The synthetic soccer pitches provided an area for kid... |
Read More |